NEW SKODA DEALERSHIP BOLTON – GLAZING, DOOR AND SHUTTER INSTALLATION

When RRG decided to open a new Skoda Dealership in Bolton we were delighted to be chosen as the preferred supplier for the windows, doors and shutters.

To the front elevation we installed an aesthetically pleasing full width curtain walling section. The section used provided high levels of rigidity and structural support to the glass and entrance doors.

To the side elevations we installed a modern design set of sliding doors allowing vehicle access, and two sets of high security fire exit doors.

Finally to the rear elevation we installed 7no. Hormann semi-high lift sectional doors to provide a reliable insulation efficient solution.

This whole project was completed on time and within budget.

Further reading

ABC Car Construction Facility Industrial Sectional Thumb

A panoramic presence - Industrial Sectional Doors at Large-Scale Construction Facility!

13 Nov 2024

A perfect fit for this project, ABC engineers attended the site and replaced the old roller shutter with a new Teckentrup industrial sectional door, offering a panoramic presence with high light penetration.

Read more

Tecentrup New Victoria Manchester Case Study Thumb

New Victoria Residential Development, Manchester

10 Oct 2024

ABC Doors, in partnership with its sister company, Teckentrup, worked on the high-rise housing project in New Victoria, Manchester for leading construction company Vinci and Muse Developments.

Read more

Teckentrup Industrial Sectional Doors At Car Wprkshop Thumb

Teckentrup industrial sectional garage doors at car workshop

02 Jul 2024

Working on behalf of Hindley Contractors Ltd, ABC & Teckentrup were approached to supply and fit three industrial sectional doors to complete a brand-new steel-framed commercial car workshop in Kidderminster.

Read more